Close Overlay
Reference List

Hyperbaric Tunneling

Reference List Hyperbaric Tunneling

  • German Flag
  • English Flag

Filter Tunneling Projects

Search TBM's:

We are active in following countries:

TBMs: 1 | Clear search / view all

Title Year Country
S-140 Thalwil Tunnel, Zurich 2000 - 2001 Switzerland
S-140 Thalwil Tunnel, Zurich

S-140 Thalwil Tunnel, Zurich

Zimmerberg Base Tunnel
Manufacturer:Herrenknecht
Machine Type:Mixshield
Country:Switzerland
Year:2000 - 2001
Diameter:12.36 m
Length:2,354 km
Geology:Molasse, crushed Stone

Two Herrenknecht shields successfully accomplished their mission in the Zurich-Thalwil core project of the Bahn 2000 (Railway 2000) project (Zimmerberg Base Tunnel). In March 1999, the mixshield TBM (Ø 12.36 m) launched from contract section 2.01. On the 2.7 km route, ca. 2,000 m was through freshwater molasse and ca. 700 m through soft mixed ground (crushed stone and deposits). The mix shield was equipped to drive through rock and soft mixed ground.